GrowNotes
Spray application manual
31 January 2025
Preparing for spraying
This section contains five modules to assist the sprayer in preparing for spraying. The modules cover the checks required before commencing operations, checks during and post-operations. Information is provided on mixing and decontamination and the calibration of the spray system. Modules cover mixing, filling and transfer systems and weather monitoring for spraying operations.
Module 6: Pre-operational checks
Module 6 focuses on keeping everything running smoothly
Module 7: Mixing and decontamination
Module 7 explores avoiding potential problems
Module 8: Calibration of the spray system
Module 8 details calibration of the spray system to ensure accuracy
- 8.1 What to calibrate and why?
- 8.2 Speed calibration
- 8.3 Section widths and nozzle spacing
- 8.4 Pressure at the nozzle and nozzle outputs
- 8.5 Flow meter calibration
- 8.6 Inflow meters or tank filling meters
- 8.7 Tank calibration
- 8.8 Calibrate induction hoppers
- 8.9 Fenceline nozzles (and other banded applications)
- 8.10 Tips for calibrating other sprayers
Module 9: Mixing, filling and transfer systems
Module 9 introduces techniques and tips to increase efficiency of mixing, filling and transfer systems
Module 10: Weather monitoring for spraying operations
Module 10 details how to assess if weather conditions are suitable for spraying
- 10.1 Introduction
- 10.2 Important weather parameters for spray operations
- 10.3 Temperature and humidity
- 10.4 Surface temperature inversions
- 10.5 Using forecast information for planning spraying activities
- 10.6 Weather-monitoring equipment
- 10.7 Weather data and forecasts for planning and conducting spraying operations
- 10.8 Summary